29 CFR 1910.147 requires a written lockout/tagout program for any employer with equipment that can release hazardous energy. The program covers scope, a machine-specific energy control procedure for each piece of equipment, employee training, and an annual audit. You can build it yourself. The master document takes a few hours. The machine procedures take longer.
What exactly does OSHA require in a written lockout tagout program?
The rule is 29 CFR 1910.147, the Control of Hazardous Energy standard. It covers any general industry employer whose workers service or maintain machines where unexpected energization, startup, or release of stored energy could hurt someone. [1]
OSHA breaks the program into a specific list. The standard requires employers to establish "a program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performs any servicing or maintenance on a machine or equipment where the unexpected energizing, start up or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source, and rendered inoperative." [1] Written documentation is required whenever a machine has more than one energy source, more than one worker does the servicing, or the lockout sequence gets complicated. In practice, inspectors expect a written program at nearly every covered workplace, not only the complicated ones.
The six things your written program document has to address:
1. Scope: which equipment and operations are covered 2. Purpose and rules: how the program applies to your facility 3. Energy control procedures: a step-by-step procedure for each machine or piece of equipment (more on this below) 4. Protective material and hardware: what locks, tags, chains, and blocks are authorized and how they get used 5. Rules on transfer of devices: who can place and remove a lockout/tagout device 6. Requirements for outside contractors: how you coordinate with contractors or vendors who service your equipment
That's the skeleton. The annual periodic inspection and the employee training requirement live in their own paragraphs (1910.147(c)(6) and 1910.147(c)(7)), but inspectors look for proof of both inside or attached to your written program. [1]
For where this rule sits in OSHA's larger structure, the lockout tagout overview on this site covers the rule's history and enforcement context.
Which businesses actually need a lockout tagout program?
Any general industry employer with workers who service or maintain machines. That's manufacturing, food processing, warehouses, auto repair shops, commercial laundries, printing shops, HVAC contractors, and plenty of others that never think of themselves as industrial. [1]
The standard skips construction (which has its own rules) and skips agriculture, maritime, and oil and gas work covered by other subparts. There's one narrow exception for cord-and-plug equipment where the plug stays under the exclusive control of the person doing the servicing, meaning they hold it in their hand. Outside that exception, if a machine has a power source that could switch on while someone's hands are inside it, the standard applies.
State plan states adopt standards at least as effective as the federal rule, and some go further. There are about 22 of them, including California and Michigan. [8] California's Title 8, Section 3314 adds requirements around tagout-only programs. [2] If you operate in a state plan state, check your state agency's site before you assume the federal text is the whole story.
One thing to be clear about: there's no employee-count exemption. A five-person machine shop carries the same written program obligation as a 500-person plant.
What are the most common OSHA citations under lockout tagout?
Lockout/tagout lands in OSHA's top 10 most cited standards year after year. In fiscal year 2023, 29 CFR 1910.147 drew more than 2,500 citations and ranked fifth on the federal list. [3]
The paragraphs inspectors reach for most:
| Citation paragraph | What it covers | Why it gets cited |
|---|---|---|
| 1910.147(c)(4) | Energy control procedures | No written procedure for a specific machine |
| 1910.147(c)(6) | Periodic inspections | No annual audit of procedures |
| 1910.147(c)(7) | Employee training | No training records or inadequate training |
| 1910.147(c)(1) | Written program | Program missing required elements |
| 1910.147(d) | Procedures for applying controls | Employees not following the established steps |
Willful violations of 1910.147 can hit $16,550 per violation as of 2024, and repeat violations carry the same ceiling per incident. [4] Serious injuries tied to uncontrolled hazardous energy show up heavily in manufacturing, though nobody has clean data on the exact share, because "LOTO-preventable" gets defined differently across studies. The Bureau of Labor Statistics tracks the underlying injury and fatality counts. [5]
Here's the takeaway inspectors will not budge on: a policy document alone doesn't cut it. They want machine-specific energy control procedures, and they want proof someone audited those procedures in the last 12 months.
How do you write machine-specific energy control procedures?
This is where most programs fall apart. A line that says "employees will lock out equipment before servicing" is a slogan, not a procedure. OSHA requires a real procedure for each machine or type of machine with more than one energy source or a lockout sequence that isn't obvious. [1]
A compliant machine-specific procedure has to include, at a minimum:
- The machine's identity (name, model, or location)
- Intended use of the procedure (what service task it covers)
- Steps to shut down the equipment
- Steps to isolate each energy source (electrical, pneumatic, hydraulic, thermal, chemical, gravitational)
- Location of each energy isolation point (breaker number, valve tag, and so on)
- Type and magnitude of energy (for example, 480V three-phase, 90 PSI pneumatic)
- Steps to verify isolation before work starts (the verification step is the one people skip)
- Steps to release or restrain stored energy (bleed down hydraulics, block gravity-loaded parts)
- Steps to restore the equipment after work is done
Writing these for every machine is the honest hard part of the whole project. A mid-size machine shop with 30 machines might spend two to three full days on procedures alone, especially if you're walking each one to pin down isolation points you weren't sure about. OSHA's Small Entity Compliance Guide (Publication 3120) lays out these procedure elements if you want the agency's own plain-language version. [7]
Format is up to you. OSHA doesn't dictate a form. Some shops build a one-page sheet with a photo or diagram of the machine marking where the lockout points are. That photo trick pays off for new hires and for anyone covering an area they don't normally work.
If you'd rather start from structure than a blank page, SafetyFolio generates a correctly structured lockout/tagout written program in about 15 minutes, including the framework for machine-specific procedures that you fill in with your own isolation points.
What hardware and materials does your program need to address?
Your program has to spell out which lockout devices are authorized, how they get managed, and what the rules are for tagout-only situations. Vague here means cited later.
The minimum your hardware section should cover:
Locks. Every authorized employee gets their own lock with a unique key. Sharing keys kills the whole point. Say in writing that locks are personal and nobody else touches them, with the one exception of emergency removal (which needs its own documented procedure).
Tags. A tag is a warning, nothing more. OSHA is blunt that tagout programs give less protection than lockout, and if a machine can be locked out, it must be. [1] Tagout stands alone only when the equipment physically can't accept a lock. Use it, and your program has to explain why locking is infeasible and document the extra protective measures.
Hasp devices. When several people work on the same equipment, each one needs their own lock on the isolation point. A hasp lets multiple locks attach to a single disconnect or valve. Cover group lockout in the program if this ever comes up.
Blocks, chains, and other restraints. For gravity-loaded parts (a press ram, a suspended load) or valves without lockout capability, name what physical restraints you use and who's allowed to use them.
Management of hardware. Where do the locks and hasps live? Who keeps the supply stocked? What happens when a lock breaks? Write it down even when it feels obvious.
OSHA doesn't specify brand or color, but a lot of facilities pick one color (red or yellow is common) so lockout devices stand apart from every other lock in the building.
How do you handle contractors and outside workers in your program?
This section trips up small businesses more than any other. 29 CFR 1910.147(f)(2) requires that when outside contractors service your equipment, you and the contractor inform each other of your respective lockout/tagout procedures, and you make sure your own employees understand and follow any restrictions. [1]
Plain version: you can't wave a contractor onto the floor and assume they know your program. You document that you told them your procedures, and you learn theirs.
A workable way to handle it is a short contractor coordination section that requires:
- A facility rep reviews lockout/tagout expectations with the contractor's supervisor before work starts
- The contractor provides their written energy control procedures (or confirms they'll follow yours)
- Contractor employees join the facility's group lockout process when working on shared equipment
- A record of that pre-work conversation exists (a dated sign-off sheet is enough)
Spell out what happens when a contractor's tagout-only approach collides with your lockout-required policy. State plainly that the more protective measure wins when there's a conflict.
What does the required annual inspection (periodic inspection) have to include?
Section 1910.147(c)(6) requires a periodic inspection of the energy control procedure for each machine at least once a year, performed by an authorized employee who isn't the one using the procedure being inspected. [1]
The point is to catch procedures that have drifted from the real machine. Maybe a valve moved. Maybe a breaker panel got relabeled. Maybe a modification added a new energy source nobody wrote down. Procedures go stale. The annual inspection is how you catch that before an injury does.
What the inspection has to document:
- The machine or equipment the procedure covers
- The date of the inspection
- The employees included in the inspection
- The name of the inspector
- For lockout procedures, a demonstration by the authorized employees performing the steps, with the inspector reviewing each one
- Certification that the inspection happened (this is the part that must be in writing)
A simple audit form clipped to the machine-specific procedure works fine. Some facilities keep the audit sheet right in the procedure binder at the machine.
One practical note. Forty procedures don't have to get audited in a single day. Spread the inspections across the year as long as each procedure gets its annual review. Keep records organized enough to prove nothing got skipped.
What training do employees need, and how do you document it?
OSHA sorts employees into three categories with different training under 1910.147(c)(7). [1]
Authorized employees perform the lockout/tagout. Their training covers:
- Recognition of hazardous energy sources
- Type and magnitude of energy at their specific machines
- Methods and means to isolate and control that energy
Affected employees have their work interrupted by a lockout, like a machine operator who can't run a press while it's locked out. Their training covers:
- The purpose of the energy control program
- The instruction never to restart or re-energize equipment that's locked or tagged out
Other employees who work where lockout/tagout is used need awareness-level training: equipment may be locked out, and they must not touch the locked devices.
Retraining kicks in when you have reason to think someone doesn't understand the program (including after a near-miss), when procedures change, or when the annual inspection turns up deviations.
Documentation is loose on format but firm on content. You need to show who was trained, on what date, and what the training covered. A sign-in sheet with a description of content, plus a copy of the agenda or materials, satisfies most inspectors.
For more on how OSHA treats training records, see the OSHA training guide on this site.
How do you structure the written program document itself?
You can write the program as one document or as a master policy with attachments. Both are fine. Here's a structure that hits everything inspectors look for:
Section 1: Purpose and scope. State what the program covers, which facilities, which types of equipment. Name 29 CFR 1910.147 directly.
Section 2: Definitions. Define authorized employee, affected employee, energy isolation point, lockout, tagout, and hazardous energy. Pull them straight from 1910.147(b), where OSHA already wrote them. [1]
Section 3: Responsibilities. Name who runs the program (a safety manager, or the owner in a small shop), who is authorized to perform lockout/tagout, and what supervisors own.
Section 4: Hardware and materials. Describe authorized devices, where they're stored, and the rules for use.
Section 5: General energy control procedure. Lay out the six-step sequence: notify affected employees, shut down the machine, isolate energy sources, apply lockout/tagout devices, release or restrain stored energy, verify isolation. This general procedure applies broadly. The machine-specific procedures are the detailed version.
Section 6: Machine-specific energy control procedures. Include them here or point to the attachment where they live. Each one should be identifiable by machine name or ID.
Section 7: Group lockout procedures. Explain how group lockout works when multiple authorized employees are involved.
Section 8: Shift or personnel changes. Cover how lockout devices get managed when the worker who applied a lock ends their shift and the equipment is still locked out.
Section 9: Contractor coordination. Explain the pre-work information exchange.
Section 10: Periodic inspection. Describe the annual audit, who performs it, and where records live.
Section 11: Training. Describe requirements by employee category and how you document them.
Section 12: Program review and revision. Explain when the program itself gets updated (at minimum after any incident, equipment change, or regulation change).
Attach your machine-specific procedures, blank audit forms, and training records as exhibits. Keep the whole package somewhere people can actually reach, not buried on a shared drive nobody knows how to search.
How long does it take to write a lockout tagout program from scratch?
Honest answer: the master policy, the part that covers scope, responsibilities, and the general procedure, drafts in two to four hours if you know your facility. That's the framework.
The machine-specific procedures take much longer. Figure 30 to 60 minutes per machine if you do it right: walk the machine, find every energy source, locate and label every isolation point, write the steps, get someone to review the draft. A facility with 20 machines can easily eat a full week of part-time work.
Total timeline for a small to mid-size facility (10 to 50 machines) with one person driving it: two to four weeks alongside normal duties. That covers walking machines, writing procedures, supervisor review, training, and filing.
The SafetyFolio program generator cuts the document-drafting portion to under an hour by building the master framework for you. The machine procedures still take what they take. There's no shortcut around walking your equipment.
What slows projects down: facilities keep finding energy isolation points nobody documented, or discover a machine got modified without anyone updating the safety paperwork. Build buffer time for those surprises.
What are the most common mistakes that cause a lockout tagout program to fail an inspection?
Most programs that fail an inspection have one of these holes:
Generic procedures instead of machine-specific ones. A single procedure that says "de-energize the machine and lock the disconnect" doesn't tell a worker which disconnect, where it is, or that there's a hydraulic accumulator that still needs bleeding. Inspectors ask to see the procedure for one specific machine, then walk to that machine and check whether the paper matches reality.
Missing annual inspection records. The procedure exists, but nothing proves anyone reviewed it in the past 12 months. Easy citation. Common one. [3]
Locks that aren't individually keyed. A common keyed lock, where everyone on the floor holds a copy of the key, defeats the lockout. Each authorized employee needs a unique lock.
No procedure for shift changes. An employee locks out a machine at the start of a shift and leaves before the job's done. How does the next shift handle it? Programs that skip this leave workers improvising, and that's how a lock gets pulled while someone's still inside the machine.
Contractor gap. The facility has a program but never mentioned it to the electrical contractor who shows up quarterly. If an inspector arrives right after a contractor incident, this gets cited under 1910.147(f)(2).
Training records that don't match the roster. Someone on the floor is doing lockout work but isn't in the training log. Could be a recent hire. Could be someone nobody ever formally added.
A program written once and never touched again. Equipment gets added. Equipment gets modified. Procedures go stale. A 2019 procedure sitting on a machine that was retrofitted in 2022 draws questions fast.
How is a lockout tagout program different from a tagout-only program?
Lockout physically stops energy from flowing by putting a mechanical locking device on the isolation point: a lock on a breaker, a locked valve, a locked plug. Tagout hangs a warning tag with no physical lock behind it.
OSHA's position is direct. Lockout is the preferred method, and tagout stands alone only when equipment can't be locked out. The standard requires that where tagout is used, "the employer shall demonstrate that the tagout program will provide a level of safety equivalent to that obtained by using a lockout program." [1] Inspectors are skeptical of tagout-only programs for any equipment that could physically take a lock.
If your program includes tagout-only procedures, put in writing:
- Why the specific equipment can't be locked out
- What extra protective measures are in place (removing valve handles, blocking actuators, disabling control circuits)
- That employees were trained on the extra hazards of tagout versus lockout
From an inspection standpoint, a tagout-only section draws more scrutiny than a lockout section. Have the justification ready before anyone asks.
What should you do first if you have no lockout tagout program at all?
Stop equipment servicing that has no lockout procedure behind it, if you can do that operationally. That's the right answer and the uncomfortable one.
In the real world, most small businesses find this gap during an inspection or a near-miss, not before. Here's a practical order of operations:
Step 1: Inventory your equipment. Walk the facility and list every machine, press, conveyor, compressor, pump, oven, and powered thing someone could reach into while it's energized. That's your scope.
Step 2: Rank the highest-risk machines. Which ones have multiple energy sources? Which ones store energy (springs, hydraulics, gravity loads, capacitors)? Write those procedures first.
Step 3: Draft the master written program. Use the structure above or a template. Get the framework in place so you have something to train from.
Step 4: Write machine-specific procedures. Walk each machine with the person who actually services it. Document every isolation point. Have them show you. Cross-check the procedure against the machine.
Step 5: Train all covered employees. Do authorized employee training before anyone follows a new procedure. Affected employee training can run as a group.
Step 6: Run your first periodic inspection. As soon as the procedures are written, do the first audit. It isn't the annual audit yet, since you just wrote them, but it catches errors and sets a baseline record.
Step 7: Set a calendar reminder for annual audits. Twelve months from the date each procedure is finalized.
You can build a working program in 30 days for a small facility. Larger sites may need 60 to 90 days to finish all the machine procedures.
For how this fits with your other OSHA written program obligations, the hazard communication guide covers the HazCom standard, which usually runs parallel to your lockout program.
Frequently asked questions
Does a business with only a few employees need a written lockout tagout program?
Yes. 29 CFR 1910.147 has no small-employer exemption. If any employee services or maintains equipment that could unexpectedly energize, the written program requirement applies. A five-person shop carries the same obligation as a 500-person plant. The scale of your program can match the scale of your operation, but it has to exist in writing.
Can I use a lockout tagout template I found online?
A template gives you structure, but it can't stand in for the machine-specific energy control procedures, which are site-specific by definition. A template that says 'de-energize the machine' without naming which breaker, which valve, and what stored energy exists is not a compliant procedure. Use a template for the master framework, then write real procedures for each machine from a physical walkthrough.
How often does a lockout tagout written program need to be updated?
At minimum, after any equipment change, process change, or hazardous-energy incident. The annual periodic inspection is also a natural review point. OSHA sets no hard revision schedule for the master program itself, but a program that hasn't been touched in years and no longer matches your equipment will fail inspection.
Do office workers or delivery drivers need lockout tagout training?
Probably not, unless they work where lockout/tagout is actively used. OSHA's 'other employees' category calls for only awareness-level training for workers who might encounter locked-out equipment in their area. If your office staff never set foot on the production floor, they fall outside the scope of the standard.
What happens if an employee loses their lockout key?
Your written program should include an emergency removal procedure. Removing a lock without the employee present requires documented supervisor authorization, an attempt to contact the employee to confirm they're clear of the machine, physical verification that the machine area is safe, and a record of the removal. Write this process into your program before you ever need it.
Does a lockout tagout program cover electrical work specifically?
29 CFR 1910.147 covers hazardous energy broadly, electrical included. OSHA's electrical safety standard 29 CFR 1910.333 also carries lockout/tagout requirements for electrical work, and the two overlap. Qualified electrical workers may follow the more detailed 1910.333 requirements for electrical tasks while 1910.147 covers other energy types. Your program should acknowledge both if qualified electrical work happens at your facility.
Can a supervisor remove an employee's lock if the employee goes home sick?
Only if your written program has a documented emergency removal procedure and it's followed. The procedure must include supervisor authorization, verification the employee left the facility, physical confirmation the machine area is safe before re-energizing, and documentation of the whole process. Pulling someone's lock without following this is a serious safety violation and an OSHA citation risk.
What is the difference between an authorized employee and an affected employee under 1910.147?
An authorized employee performs the lockout or tagout to service or maintain equipment. An affected employee operates or uses that equipment during regular work but doesn't perform the servicing. Authorized employees get detailed training on energy sources and control methods. Affected employees get training on why the program exists and that they must never restart locked-out equipment.
Do I need a separate procedure for every single machine or can I group similar machines?
OSHA allows grouping when machines are essentially identical in type, design, and energy sources and the same procedure fits all of them without modification. That's a 'common procedure.' The machines have to be genuinely interchangeable in isolation steps. Any meaningful difference in energy sources, isolation point locations, or lockout sequence means separate procedures. When in doubt, write separate ones.
How do I handle equipment that a contractor owns and brings to my facility?
The 1910.147(f)(2) coordination requirement runs both ways: the contractor's procedures for their equipment apply to that equipment, but you must inform them of your facility's lockout program and any restrictions. Your employees who work near that contractor's equipment need to know not to touch any lockout devices on it.
What is the OSHA penalty for not having a written lockout tagout program?
As of 2024, OSHA serious violation penalties can reach $16,550 per violation, and willful or repeat violations can also reach $16,550 per violation. One inspection can produce multiple citations, each tied to a different paragraph of 1910.147. A facility with no written program, no machine-specific procedures, and no training records can face several citations from a single visit.
Can I use a digital lockout tagout program instead of paper?
Yes. OSHA doesn't require paper. Digital programs on tablets, phones, or computers are fine as long as authorized employees can reach the procedures they need at the point of use. Annual inspection records and training documentation also work in digital form. The real test is whether someone can pull up the procedure for Machine #14 while standing next to it, before starting work.
Does my lockout tagout program need to be in languages other than English?
OSHA requires training in a manner employees understand, which includes language. If authorized employees at your facility aren't English-proficient, your procedures and training materials need to be available in the languages they read and understand. This applies to both the training and the machine-specific procedures they follow on the floor.
Sources
- OSHA, 29 CFR 1910.147 The Control of Hazardous Energy (Lockout/Tagout): Requirements for written energy control program, machine-specific procedures, periodic inspections, training, and tagout limitations
- California DIR, Cal/OSHA Title 8 Section 3314 Control of Hazardous Energy: California state plan lockout/tagout standard with additional requirements compared to federal 1910.147
- OSHA, Top 10 Most Frequently Cited Standards FY2023: 29 CFR 1910.147 cited more than 2,500 times in FY2023, ranking fifth among most frequently cited standards
- OSHA, Penalties: Serious violation penalties can reach $16,550 per violation as of 2024; willful and repeat violations carry the same maximum
- Bureau of Labor Statistics, Injuries, Illnesses, and Fatalities: BLS tracks workplace injury and fatality counts, including those in manufacturing where hazardous energy is a factor
- OSHA, Control of Hazardous Energy (Lockout/Tagout) Overview: General guidance on scope, applicability, and requirements of the lockout/tagout standard
- OSHA, Small Entity Compliance Guide for the Control of Hazardous Energy (Publication 3120): OSHA guidance document explaining energy control procedure elements required for compliance with 1910.147
- OSHA, State Plans: List of approximately 22 state plan states with their own occupational safety standards at least as effective as federal OSHA
- OSHA, 29 CFR 1910.333 Selection and Use of Work Practices (Electrical Safety): Lockout/tagout requirements specific to electrical work that overlap with 1910.147 for general industry